引用


Sign Up

欢迎来到 特雷克斯越野起重机

crespellano_factory_web

关于特雷克斯越野起重机

特雷克斯越野起重机的设计和组装完全由TEREX ITALIA Srl公司负责,该公司位于意大利Crespellano(BO)的生产基地,集研发、生产、销售、服务和零部件于一体。这种存在,加上经验丰富、训练有素的员工,确保了每台起重机的质量。

特雷克斯越野起重机是特雷克斯公司材料加工部门的一部分,是全球高空作业平台和材料加工机械制造商。特雷克斯公司设计、制造和支持用于建筑、维修、制造、能源、矿产和材料管理应用的产品,其设施遍布全球,包括北美和南美、欧洲、澳大利亚和亚洲
Website-Breakers_Thinner

我们的产品

RT 90 rough terrain

North America

Rough Terrain Cranes

Website-Breakers_Thinner

选择您的应用

icon_appl_infrastructure

基础设施 

icon_appl_port

港口 

icon_appl_mining

采矿业

icon_appl_energy-related

能源相关 

icon_appl_yard-logistics

堆场物流 

icon_appl_general-lifting

普通吊装 

Website-Breakers_Thinner

支持

icon_funct_sales

销售

icon_funct_service

服务

icon_funct_parts

配件

icon_funct_training

培训

icon_funct_financing

设备融资

Website-Breakers_Thinner

新闻和故事

Terex RT 35-1 Crane Destined for Research in Antarctica

It’s not every day that a crane is shipped to a far-flung destination in the Antarctica, but that is exactly what EWPA Sp. z o. o, Terex Cranes’ official distributor in Poland did to deliver a Terex Rough Terrain (RT35-1) to serve the Polish Antarctic Station Henryk Arctowski.

For over 40 years, the Station has provided technical and logistical support for Polish and international research groups conducting research in Antarctica. The crane was purchased by the Institute of Biochemistry and Biophysics of the Polish Academy of Sciences to permanently support year-round scientific research, which will focus on biology and ecology, but also include oceanography, geology, geomorphology, glaciology, meteorology, seismology. The research station also carries out ecological, glaciological, hydrological, meteorological and marine monitoring.

The Station is located in the Southern Hemisphere in the South Shetland Islands, on King George Island, off the coast of Admiralty Bay. The island belongs to the climatic maritime zone of Antarctica.

“This has been one of the most interesting sales we have had in our 30-year sales career,” said, Marketing Manager Mrs. Hanna Stanoch from EWPA. “Never before did we have to ship a machine to such a distant corner of the world, a delivery over a distance of over 14,000 km, which took several weeks.

”The RT 35-1 is a 35 t (38.5 USt) rough terrain crane with a 30.1 m (98.75 ft) full power mechanically synchronized boom. It has three steering modes and enhanced safety features, to include easy access to cab and carrier deck and no obstacles on the top deck. 

Marketing manager Mrs. Hanna Stanoch from EWPA said, “Being in such a remote location, having a solution that can get the job done but is robust and reliable enough to withstand the harsh climatic and geographical conditions of the Antarctica were key requirements for the job. We had no hesitation in recommending the RT 35-1 for the job – in our experience we know it can travel and manoeuvre over the harshest terrain with ease, its high-strength steel can endure extreme cold temperatures, while its rugged axles and machine superstructures handle snow.”

Stephan Wijkmans, Sales Manager Terex Cranes said, “We’re pleased to see our RT 35-1 used in such a unique application and location—it is a clear demonstration that our rough terrain cranes can do the work but also handle off road jobsites and extreme conditions. We have no doubt that with the world-class design and manufacturing that has gone into our RT 35-1, along with the service and support provided by EWPA, this crane will achieve ultimate efficiency and productivity for the Polish Antarctic Station Henryk Arctowski, well into the future.”

Founded in 1989 in Poznań to focus on the construction machinery industry, EWPA has grown to become one of Poland’s largest and most reputable distributors. The team prides themselves on constantly developing their knowledge base and skillset, all in order to provide services at the highest level. For more information on how EWPA can support your needs, visit http://ewpa.pl/ or contact: info@ewpa.pl / +48 61 810 75 13.