M413 Processing Overburden

A Customer’s quarry in Austria contained a large amount of un-used overburden material that needed to be processed.
The Challenge:
The overburden material that had been previously classed as waste was taking up a large area of the quarry. This was making it difficult for the customer to expand. They needed to process this material to access a new area of the quarry, but they knew there was also a lot of good useable aggregates contained in the overburden.
The M413 Heavy Duty Trommel Solution:
Our MDS M413 offered the customer a unique solution to processing the overburden material. The 80mm (3”) fully welded drum removes the fines material from the overburden and the drum cleaner means the customer can continue to run even when they encounter very sticky clay-bound material. The heavy-duty design means the M413 can accommodate large in-feed material up to 600mm without the need to pre-process and a changeable mid-product screen gives the customer the versability to make different sized saleable products.


Location: Austria

Application: Rip-Rap

Machine: M413 Trommel
Job Requirements:
-Process the Quarry overburden to accommodate quarry expansion
-Create a clean over-sized product that can be further processed by a crusher without causing blockages and excessive wear
- Produce a mid-product correctly sized for direct sale